Atelsan Ceiling Light Junction Box

Atelsan Ceiling Light Junction Box

Perfect curve.

Effortless work.

Scroll to Explore
Atelsan Lamba Takozu Teknik Görsel
Atelsan Lamba Takozu Görseli
Atelsan Lamba Takozu Görseli
Atelsan Lamba Takozu Görseli
Atelsan Lamba Takozu Görseli
Atelsan Lamba Takozu Görseli

Hardware Standards.

Raw Material Flame Retardant Polymer (Halogen Free)
Pipe Compatibility 14mm, 16mm, 18-20mm Multi-Diameter
Usage Area Concrete Ceiling, Beam, Hollow Block
Intellectual Property TPE Patented Design

Highlights.

Susta Yönlendiren Kavisli Tavan

Curved Ceiling.

Allows the fish tape to turn downwards automatically without getting stuck. Ends the need for ladders.

Modüler Kilit Sistemi

Modular Lock.

Junction boxes interlock with each other using a special sliding system. Creates regular lines.

Montaja Hazır

Ready for Assembly.

Special screw slots for nailing to the ceiling mold and then screwing the chandelier.

Evolution

The Professionals'
Choice.

Traditional Method

Atelsan Lamba Takozu
  • The fish tape gets stuck due to the angular inner structure, causing hassle.
  • Needs to be taped to prevent concrete water from entering.
  • Going up and down the ladder to catch the fish tape wastes time.

Atelsan Ceiling Light Junction Box

Atelsan Lamba Takozu
  • Its curved ceiling guides the fish tape directly downwards without getting stuck.
  • No need for taping thanks to its tightening structure.
  • The cable hangs automatically, finishing the job without a ladder.

How to use?

Practical and fast installation.

Kurulum Adım 1: Hazırlık
1

Prepare

Bring the required number of Atelsan Ceiling Light Junction Boxes side by side and lock them together by pushing the slides.

Kurulum Adım 2: Çakın
2

Nail

Place the assembled junction boxes in position on the ceiling mold. Nail them to the mold through the screw holes on the edges.

Kurulum Adım 3: Sabitleyin
3

Secure

Simply push the pipes into their slots. Thanks to the special conical compression structure, there is no need for taping.

Kurulum Adım 4: Hazır
4

Ready

Send the fish tape after the concrete is poured and the mold is removed. It hangs straight down without getting stuck.